Skip to content

Projects

Real work. Real photos.

Our projects, from construction to completion. Firestop caulking photos have been AI-tidied; all other job photos are untouched.

Before & after

Drag across each photo to compare.

Deck and yard finish: After
Deck and yard finish: Before
BeforeAfter
Deck and yard finish
Back step rebuild: After
Back step rebuild: Before
BeforeAfter
Back step rebuild

A bathroom, studs to finish

Heated floor, waterproofed shower and a full stainless shower panel, start to finish.

  1. 01 Shower walls going up

  2. 05 Tiling in progress

  3. 12 Finished shower, glass enclosure

Insulation & Attic Work

Before: existing attic insulation
Old insulation removed
Removal setup at the house

Rodent Cleanup & Sanitation

Old insulation, up close
Working through the attic
Every bay cleared

Drywall & Framing

Steel stud wall
Framing above the board
Board hung to the deck

Ceilings

Texture repair in progress
High ceiling — taping & finishing in progress
Vaulted ceiling, boarded

Decks & Exterior

Finished deck from the yard
Stone walkway going in
Deck, side view

Bathrooms & Tile

Walk-in shower, finished

Fire-Stopping

Sealant around pipe penetrations
Firestop around a pipe
Firestop around cables

Free, no-pressure estimates

Let's talk about your project.

Tell us what you need. You'll hear back directly from Kelvin or his son to discuss the scope and who will carry out the work.